Pub. Resources Code § 21080.77

Pub. Resources Code § 21080.77

Midway Rising project EIRDIVISION 13. ENVIRONMENTAL QUALITY › CHAPTER 2.6. General

Key provisions · Claude summary, not statute text

The Legislature deems the Midway Rising Specific Plan Subsequent Final EIR sufficient for CEQA and makes its mitigation enforceable.

  • EIR deemed sufficient. The Midway Rising Specific Plan Subsequent Final EIR (SCH No. 2023120451), with non-substantive City Council corrections, is deemed complete for CEQA compliance and final and conclusive. (b)
  • Conclusive reliance. Any approval of the project reviewed in that EIR may rely conclusively on it. (b)
  • Mitigation as conditions. All adopted mitigation measures, including the MMRP, become enforceable conditions of approval monitored by the lead agency for the life of each obligation. (c)
  • Annual reporting. The project applicant must submit an annual status report on mitigation implementation to the lead agency. (c)
  • Operative date. The section is operative on its effective date or on City Council certification of the EIR, whichever is later. (d)

Paraphrased from the statute text; each point cites its subdivision. Check the text before relying on it.

ClaudeGreen text is a summary heading written by Claude to help navigate. It is not statute text; the statute text is in black.

§ 21080.774 subdivisions

Source. California Code text from the Legislature's bulk download (the same data as leginfo), reproduced character for character (spacing normalized). Current page on leginfo ↗

History. (Added by Stats. 2026, Ch. 786, Sec. 1. (SB 344) Effective September 29, 2026. Conditionally operative on or after September 29, 2026, as prescribed by its own provisions.)

Statute text comes from the California Legislative Information page saved for this section; spacing and line breaks are normalized and every other character is reproduced as published. Check leginfo for any amendment made after the page was saved. Not legal advice.