Extremely affordable adaptive reuse projectsTITLE 7. PLANNING AND LAND USE › DIVISION 1. PLANNING AND ZONING › CHAPTER 4.2. Housing Development Approvals

Key provisions · Claude summary, not statute text

Makes “extremely affordable adaptive reuse projects” on infill parcels an allowable use notwithstanding inconsistent local plans and zoning, with limits on local standards and deadlines for identifying conflicts.

  • Definitions. Defines “dedicated to industrial use,” “development proponent,” “extremely affordable adaptive reuse project,” “housing development project,” “industrial use,” “infill parcel,” “local agency,” “lower income households,” “public transit,” and “very low income households.” (a)
  • Qualifying project. An “extremely affordable adaptive reuse project” is a multifamily project retrofitting a residential or commercial building that allows temporary dwelling or occupancy, entirely within the existing envelope. 100% of units (excluding managers’ units) must be for lower income households and at least 50% for very low income households, deed-restricted for 55 years (rental) or 45 years (owner-occupied). (a)(3)
  • Allowable use. The project is an allowable use if it is on an infill parcel, is not on or adjoining a site with more than one-third of square footage dedicated to industrial use, does not eliminate existing open space, and provides onsite management for 50 or more units. (b)(1)
  • Local standards. The agency may impose objective design review standards but may not impose or require curing deficits in maximum density, maximum FAR, additional parking, or additional open space. (b)(2)–(3)
  • Industrial adjacency denial. The agency may deny a project on or adjoining a site with any industrial square footage if it makes written findings of an adverse effect on public health and safety. (b)(4)
  • HAA consistency. A project consistent with subdivision (b) is deemed consistent and compliant with applicable standards for purposes of the Housing Accountability Act. (c)(1)
  • Conflict deadlines. Written documentation of conflicts with objective standards is due within 60 days of a complete submittal (150 or fewer units) or 90 days (more than 150 units); otherwise the application is deemed consistent. (c)(2)–(3)

Paraphrased from the statute text; each point cites its subdivision. Check the text before relying on it.

ClaudeGreen text is a summary heading written by Claude to help navigate. It is not statute text; the statute text is in black.

§ 65913.123 subdivisions

Source. California Code text from the Legislature's bulk download (the same data as leginfo), reproduced character for character (spacing normalized). Current page on leginfo ↗

History. (Added by Stats. 2023, Ch. 764, Sec. 1. (AB 1490) Effective January 1, 2024.)

Cites, in this navigator. Gov. Code § 65589.5, Health & Saf. Code § 50052.5, Health & Saf. Code § 50105, Health & Saf. Code § 50079.5

See these connections on the network →

Other sections cited. 1 sections outside this navigator are underlined in the text; hover one for its leginfo link; the References tab lists them all.

Statute text comes from the California Legislative Information page saved for this section; spacing and line breaks are normalized and every other character is reproduced as published. Check leginfo for any amendment made after the page was saved. Not legal advice.